Our technicians have a wide range of experience, working well as a team to meet specific requirements of our clients. As a team, we all strive to meet deadlines, and provide the best results possible. Electrical fixed wiring testing for all types of Industry, providing you with reports that help you maintain a safe environment. We are NICEIC approved, which is recognised by all industries.
We carry out many levels of design throughout the Industry Including commercial, industrial and hazardous areas. Our areas of expertise cover three phase solutions to control systems, process and many other applications. We also have a mechanical division who specialise in the design & installation of plumbing, heating and specialist building works.
Our engineers are Gas Safe registered. West Supply Electrical Contractors were established in 1986 and set out to service the Industrial and commercial markets of electrical installation and maintenance. The types of contracts undertaken were diverse and became even more so over the subsequent years.
We carry out many levels of design throughout the Industry Including commercial, industrial and hazardous areas. Our areas of expertise cover three phase solutions to control systems, process and many other applications. We also have a mechanical division who specialise in the design & installation of plumbing, heating and specialist building works.
Our engineers are Gas Safe registered. West Supply Electrical Contractors were established in 1986 and set out to service the Industrial and commercial markets of electrical installation and maintenance. The types of contracts undertaken were diverse and became even more so over the subsequent years.
Services
An Ethanol Blending System that spanned work across the whole of the two sites.
We were successful in securing both the Murco Wetserleigh and Murco Theale projects worth circa 450K.
Our scope included an MCC with HMI interface at the control room.
A new 400 Amp sub main was extended from the existing MCC into a new switch room at Westerliegh.
Large amounts of new containment, wiring to blending and off-loading Pumps and controls, metered dosing at each of the loading bays and Infra-red and linear heat cable fire detections systems.
We were successful in securing both the Murco Wetserleigh and Murco Theale projects worth circa 450K.
Our scope included an MCC with HMI interface at the control room.
A new 400 Amp sub main was extended from the existing MCC into a new switch room at Westerliegh.
Large amounts of new containment, wiring to blending and off-loading Pumps and controls, metered dosing at each of the loading bays and Infra-red and linear heat cable fire detections systems.
During the electrical installation of New Earth Solution's MBT Recycling plant in Avonmouth for Dean & Dybal, the main contractor, we struck up a very good relationship with NES.
Having delivered a successful project, we were invited to Tender for the Waste to Energy plant (New earth Advanced Thermal, or NEAT for short.)
Following our successful tender, we worked closely with the NEAT Team on the electrical design for the waste to energy process.
Hot gasses are produced in the NEAT units which are drawn into a very large boiler to produce steam for the turbines.
Having delivered a successful project, we were invited to Tender for the Waste to Energy plant (New earth Advanced Thermal, or NEAT for short.)
Following our successful tender, we worked closely with the NEAT Team on the electrical design for the waste to energy process.
Hot gasses are produced in the NEAT units which are drawn into a very large boiler to produce steam for the turbines.